Resource Category |
Tonnes (M) |
Gold Grade (gpt) |
Contained Gold (oz) |
|
Measured |
4.7 |
0.91 |
137,500 |
|
Indicated |
5.9 |
0.67 |
127,100 |
|
M & I |
10.6 |
0.78 |
264,600 |
|
Inferred |
23.9 |
0.58 |
446,000 |
Notes to accompany the Historical Resource table:
- Information regarding the historical resource at Pico Machay were obtained from the report titled: “Independent Technical Report and Resource Estimate Pico Machay Gold Deposit” prepared by Caracle Creek International Consulting Inc. for Aquiline Resources Inc (purchased by Pan American Silver) on November 25th, 2009. The resource numbers are highlighted in the Pan American News Release dated September 11, 2024 and found on both the Pan American website and on www.sedarplus.ca.
- The Qualified Person for the Pico Machay Project is David Thomas of DKT Geosolutions Inc.
- All resource estimates for Pico Machay are considered historical in nature and are based on prior data and reports prepared by previous property owners.
- A qualified person has not done sufficient work yet to classify the historical estimates as current resources in accordance with current CIM categories and the Company is not treating the historical estimates as current resources. Significant data compilation, redrilling, resampling and data verification may be required by a qualified person before the historical estimates on the project can be classified as a current resource.
- There can be no assurance that any of the historical mineral resources, in whole or in part, will ever become economically viable. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability. Even if classified as a current resource, there is no certainty as to whether further exploration will result in any inferred mineral resources being upgraded to an indicated or measured resource category.
Technical Information
All scientific and technical information on this website has been prepared by, or approved by David G. Thomas, P.Geo. and Joanne C. Freeze, P.Geo. Qualified Persons as defined by National Instrument 43 101 for the Pico Machay Project. Ms. Freeze is the President and CEO of Xali Gold and Mr. Thomas is Independent.
Resources were estimated using historical drilling (up to 2004) and current drilling (drilled between 2004 and 2008). The resource estimate includes holes up to Hole ABS-246, drilled in 2008. Micromine software (Version 11.0.4) was used to facilitate the resource estimating process and the estimate was prepared in accordance with CIM Standards on Mineral Resources and Reserves. Mineralized zones were outlined to enforce geological control during block modelling. The geological continuity of the broader mineralized zones, especially for the main zone, was quite good and could be readily followed from hole-to-hole and section-to-section. An average specific gravity (rock density) value, based on eleven samples, of 2.31 was used. A block model was created, constrained by the zone wireframes. Blocks in the Inferred category were defined based on search ellipse parameters with a range of 40m. Blocks in the Indicated and Measured categories were identified manually, based on drill intercepts spacing values of 27 and 20m, respectively. Ordinary block kriging was used to estimate block grades.